Project Description
As part of a scheduled six-month maintenance program, the removal and reinstallation of the Re-Boiler vessel penny ends was carried out to facilitate high-pressure water jet cleaning of the internal tanks. The project required precision lifting and controlled movement of the penny ends to ensure safe access for cleaning operations.
Scope of Work: Croft Rigging and Lifting were appointed to execute all rigging and lifting operations throughout the five-week shutdown period. Their responsibilities included:
Conclusion
The project was successfully completed within the scheduled shutdown period, with all lifting operations conducted efficiently and without incident. The expertise of Croft Rigging and Lifting ensured the safe removal, repositioning, and reinstallation of the penny ends, allowing maintenance teams to effectively clean the tanks and restore operational efficiency.
This project underscores the critical role of expert rigging and lifting solutions in industrial maintenance, highlighting the importance of meticulous planning, skilled execution, and stringent safety measures in high-risk environments.